CDC-140
Renovation and extension of an office building converted into 42 high-end apartments. A further floor with a wooden structure is added on top of the existing concrete one. The work was completed in 18 months.
The work is carried out by the Herpain company team.
- Designer and DO: Faidherbe & Pinto Architectes
- Intervention: Production manager
- Investment: +6 M
- Built surface: 5.076 m2